Overview
In 2026, SAS Scaffolding was appointed to design, supply, and install a comprehensive access solution for the Cocoa Yard re-roofing project in Nantwich. Working within a busy commercial courtyard near Pillory Street, the project required detailed planning, stakeholder coordination, and robust public safety measures to support roofing works while maintaining business operations and public access.
A fully compliant independent access scaffold system with integrated public protection was installed, enabling safe and efficient roofing works. Through effective planning, adherence to industry best practice, and proactive safety management, the project was completed with zero incidents.

Key Facts:
Project: Cocoa Yard Re-RoofingLocation: Cocoa Yard, Nantwich
Client: Welsha Construction (Roofing)
Project Value: £15,535
Scaffold Type: Full Access Scaffold with Public Protection
Height: Approx. 9 metres
Lifts: 5
Original Programme: 6 weeks
Extended Programme: 8 weeks
Challenges
The town centre location presented significant logistical and operational challenges. Access to neighbouring business rooftops was required to erect and tie the scaffold structure, necessitating early engagement with multiple stakeholders to arrange access, minimise disruption, and address concerns.
Maintaining safe pedestrian movement was critical, particularly preserving disability access to Nantwich Museum. Scaffold deliveries and installation activities also required careful coordination due to restricted access and high footfall within the area.
Project Delivery
Working closely with the principal contractor, local businesses, and the local authority, SAS Scaffolding developed a phased installation strategy that minimised disruption while maintaining access for occupants, visitors, and service deliveries.
Local authority approvals were secured for pavement occupation and a parking bay suspension on Pillory Street, allowing materials to be safely delivered and offloaded. The scaffold incorporated public protection measures, controlled work zones, and clearly defined pedestrian routes to ensure the surrounding environment remained safe and accessible throughout the project.
Regular inspections and site monitoring were undertaken to maintain compliance with industry standards and ensure the scaffold remained safe and fit for purpose as the roofing works progressed.

Results
The project was successfully delivered within a constrained urban environment while maintaining uninterrupted public access and allowing surrounding businesses to remain fully operational.
Key outcomes included:
Zero incidents throughout the project.
Continuous pedestrian and business access maintained.
Disability access preserved for Nantwich Museum visitors.
Successful coordination with local authority stakeholders to secure all required permits and approvals.
Safe installation and management of scaffolding within a high-footfall commercial environment.
Flexible project scheduling to accommodate evolving client requirements.
100% client satisfaction upon completion.
Conclusion
The Cocoa Yard project demonstrates SAS Scaffolding's ability to deliver safe, compliant, and adaptable access solutions within complex urban environments. Through meticulous planning, technical expertise, and a strong commitment to safety, the team successfully supported the refurbishment works while protecting the public, maintaining accessibility, and minimising disruption to local businesses.